Home About us Contact us  
  Portfolio: Bathroom refit  
On this bathroom we removed existing tiles and re-bonded (plastered the walls).
The floor was bowed due to a drainage problem that had occured in the past. Subsequently we took all the bathroom flooring up and then discovered that the floor joists had been put in too far apart with no noggins to tie them together. Once the floor had been restructured, we laid new 22mm interlocking floor boards.

New wall tiles were laid and the ceiling & door painted.

We fitted a complete new shower unit (including the shower, tray and screen), toilet and sink. Other items fitted include a mirror, shelf, towel holders, tooth brush & toilet roll holders.
Back to portfolio >